Home Mumbai Metro Line 9 (Red Line): Stations, Fare, Route Map, Status, & Timeline

Mumbai Metro Line 9 (Red Line): Stations, Fare, Route Map, Status, & Timeline

Line Status:

Mumbai Metro Line 9 (Dahisar East – Mira Bhayandar) metro corridor is 11.38 KM fully Elevated and consists of 7 stations from Dahisar East – Mira Bhayandar.

Metro corridor 9 is an extension of the Metro line 7 plan. Initially, it was planned to run the metro line between Dahisar and Andheri, but later, the state government decided to extend the metro route.

The entire metro route stretch for metro lines 7, 7A, and line 9 are officially color-code as Red and also called as Mumbai Metro Red Line.

Mumbai Metro Line 9 (Dahisar East – Mira Bhayandar) Stations

Below is the list of stations on Mumbai Metro Line 9 i.e., Dahisar East – Mira Bhayandar corridor. There are a total of 10 stations on the line, which are fully elevated.

#Station NameStatusTypeConnections
1Dahisar(E)Under ConstructionElevatedInterconnect Mumbai Metro Line 7 – Red Line and Mumbai Metro Line 2A – Yellow Line
2Pandurang WadiUnder ConstructionElevated

3Amar Palace (Miragaon)Under ConstructionElevatedInterconnect Mumbai Metro Line 10 – Green Line
4Zankar Company (Kashigaon)Under ConstructionElevated

5Sai Baba NagarUnder ConstructionElevated

6Deepak Hospital (Medtiya Nagar)Under ConstructionElevatedInterchange station for other branch MBMC Sports Complex and Indralok Stations
7Shahid Bhagat Singh Garden (Maxus Mall)Under ConstructionElevated

8Subhash Chandra Bose StadiumUnder ConstructionElevated

9MBMC Sports ComplexUnder ConstructionElevated

10IndralokUnder ConstructionElevated

Mumbai metro Line 9 Construction

Project History and Other Details

More About Metro Line 9 Project

Metro Line 9 is unique from all other metro lines in Mumbai because this line will have a double-decker bridge. The first deck will have an elevated flyover, and the metro train will run in the second deck.

 

The plan to construct a double-decker was required since Kashimira width is only 45m, and if a metro corridor has to be built, it will lead to congestion on the road. The flyover bridge will start from Shivaji Statue to Golden Nest Junction, covering 3.5km in length. A Double-decker bridge will be the first in Mumbai metropolitan region.

 

Metro line 9 also makes it unique because it will be the biggest metro depot in Mumbai. The Maintenance depot will be used for the entire Red Line Metro Corridor, i.e. Metro Lines 7, 7A and 9. A maintenance depot has been planned to be constructed at Mira-Bhayandar near Subhash Chandra Bose Stadium (Bhayander West) with a total land area of 20.0 Ha.

 

Mumbai Metro Line 9 (Red Line) shall provide interconnectivity with Metro Line 7 (Red Line), Metro Line 2A (Yellow Line), Mumbai Metro Line 10 (Green Line) and Western Express Highway. Commuters travelling from Mira-Bhayander will be able to travel on different metro routes. After successfully implementing the metro lines 7, 7A and 9 projects, commuters will be able to travel to Terminal 2 International Airport very conveniently and much faster than current transportation options.

Planning and Construction Phase:

In February 2017, MMRDA announced that DMRC started preparing the detailed project report (DPR), an extension of Mumbai Metro 7 till Mira-Bhayander.

In September 2018, the Maharashtra government approved the extension plan and identified the implementation project as Metro Line 9. MMRDA awarded the contract to J Kumar for Metro 7A and Metro 9. 

 

In December 2018, Prime Minister Narendra Modi had laid the foundation stone for Metro 5 (Thane-Bhiwandi-Kalyan) and Metro 9 (Dahisar-Mira Bhayander) along with Maharashtra chief minister Devendra Fadnavis.

 

In September 2019, the work on the much-awaited Metro-9 project finally commenced. The estimated cost for the extension for Metro lines 7A and 9 is ₹6518 Crore.

 

The Metro Line – 9 (Red Line) route covers 10 stations in which 2 stations are planned as branch stations that will be operated as shuttle operations between DEEPAK HOSPITAL, MBMC SPORTS COMPLEX, and INDIRALOK

 

Y Branch Metro 9 Red Line Mira Bhayander

 

The planned station names are Dahisar (East), Pandhurang Wadi, Amar Palace (Miragaon), Zankar Company (Kashigaon), Sai Baba Nagar, Deepak Hospital (Medtiya Nagar), Shahid Bhagat Singh Garden (Maxus Mall), Subhash Chandra Bose Stadium, MBMC Sports Complex, Indralok.

Project Overview

Project/Metro Name: Dahisar East – Mira Bhayandar Corridor

Line Number: 9

Official Line Color: Red

Status: Under Construction

Distance: 11.38KM

Total Stations: 10 Stations

Depot: Mira Bhayander Depot

Operator: Mumbai Metropolitan Region Development Authority (MMRDA)

Project Started: September 2019

Project Completion:

Estimated Cost: ₹6518 Crore (Metro lines 7A and 9)

Detailed Project Report (DPR)View Here

Website: https://mmrda.maharashtra.gov.in/metro-line-9

Ridership Details

Daily Estimated Ridership: 8.47 lakhs/day by 2021 and 11.12 lakhs/day by 2031. (Estimation including Metro Line 9 and 7A)

Metro Timings: 

Metro Fare: 

Technical Overview

Track length: 11.38 km 

Track Type: Elevated

Metro Type: Rapid Transit

Number of tracks: 2

Operating Speed: 80km/hr (50mph)

Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge

Electrification: Overhead 25 kV AC

Image Gallery:

Timeline Mumbai Metro - Line 9 (Red Line)

Timeline coming soon