Mumbai Metro Line 6 (Swami Samarth Nagar (Lokhandwala) – JVLR – Powai – Vikhroli) metro corridor is 14.47 KM fully elevated and consists of 13 stations.
Metro line 6 corridor will be the second metro line that will connect the western and eastern suburbs. Currently, Metro Line 1 (Versova-Andheri-Ghatkopar) is the only metro line which provides east-west connectivity. The available routes for travelling by road between east-west are Jogeshwari-Vikhroli Link Road (JVLR), Santacruz-Chembur Link Road and the Andheri-Ghatkopar Link Road.
People are majorly dependent on roads for travelling between East-West suburbs; as a result, there is heavy congestion on the road. The overall idea behind this project is to decongest the heavy traffic on east-west connecting roads by implementing efficient mass transit connectivity.
The metro corridor will connect Lokhandwala in the eastern suburb, which will pass through Jogeshwari, Western Express Highway, JVLR, Powai, and goes all the way to Vikhroli in the eastern suburbs.
Similarly to Mumbai Metro line 9, Metro Line 6 will also have a double-decker bridge. The first deck will have an elevated flyover, and the metro train will run on the second deck. The flyover will provide road connectivity from Jogeshwari to JVLR.
The official colour assigned to metro Line 6 is Pink, also called Mumbai Metro Pink Line.
Mumbai Metro Line Line 6 (Swami Samarth Nagar - Vikhroli) Stations
Below is the list of stations on the Mumbai Metro Line 6 (Swami Samarth Nagar – Vikhroli) corridor. There are a total of 13 stations on the line, which are fully elevated.
# | Station Name | Status | Type | Connections |
---|---|---|---|---|
1 | Swami Samarth Nagar | Under Construction | Elevated | – |
2 | Adarsh Nagar | Under Construction | Elevated | Interconnect Mumbai Metro Line 2 – Yellow Line |
3 | Jogeshwari (West) | Under Construction | Elevated | Jogeshwari railway station |
4 | Jogeshwari-Vikhroli Link Road | Under Construction | Elevated | Interconnect Mumbai Metro Line 7 – Red Line |
5 | Shyam Nagar | Under Construction | Elevated | – |
6 | Mahakali Caves | Under Construction | Elevated | – |
7 | SEEPZ Village | Under Construction | Elevated | Interconnect Mumbai Metro Line 3 – Aqua Line |
8 | Saki Vihar Road | Under Construction | Elevated | – |
9 | Rambaug | Under Construction | Elevated | – |
10 | Powai Lake | Under Construction | Elevated | – |
11 | IIT Powai | Under Construction | Elevated | – |
12 | Kanjurmarg (West) | Under Construction | Elevated | Interconnect Mumbai Metro Line 4 – Green Line |
13 | Vikhroli (EEH) | Under Construction | Elevated | – |
Mumbai Metro Line 6 Route Map (Under Construction Line)
Project/Metro Name:Swami Samarth Nagar – Vikhroli
Line Number: 6
Official Line Color: Pink
Status: Under Construction
Distance: 14.47 KM
Total Stations: 13 Stations
Depot: Kanjurmarg
Operator: Mumbai Metropolitan Region Development Authority (MMRDA)
Project Started:
Project Completion: Expected to complete by 2025
Estimated Cost: ₹ 6,672 crore
Detailed Project Report (DPR): View Here
Website: https://mmrda.maharashtra.gov.in/its
Daily Estimated Ridership: 7.69 lakhs/day by 2031
Metro Timings: –
Metro Fare: –
Track length: 14.47 km
Track Type: Elevated (0.98 km) & Underground (2.915 km)
Metro Type: Rapid Transit
Number of tracks: 2
Operating Speed: 80km/hr (50mph)
Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification: Overhead 25 kV AC
Timeline Mumbai Metro - Line 6 (Pink Line)
Timelines Coming Soon