Mumbai Metro Line 3 (Aqua Line): Route, Stations, Timings, Fare & Status

Mumbai Metro

Part of our Mumbai Metro guide โ€” every line, fare, timing and status update in one place.

Mumbai Metro Line 3 (Aqua Line) is Mumbai’s first fully underground metro: a 33.5 km line from Cuffe Parade in south Mumbai to Aarey JVLR, via Churchgate, CSMT, Mumbai Central, Dadar, BKC, the airport and SEEPZ. All 27 stations have been open since October 2025.

Fully operational ยท Cuffe Parade โ€“ Aarey JVLR

Timings

5:55 AM โ€“ 10:30 PM

Fare

โ‚น10 โ€“ โ‚น70

Stations

27, all open

Airport โ€“ Cuffe Parade

About 45 min

Last checked: October 2026 ยท Timings and fares can change โ€” confirm on the official app or website.

Metro Line 3 route & stations

All 27 stations are Operational ยท ๐Ÿš† Railway ยท โœˆ๏ธ Airport ยท โ“‚ Metro

  • Cuffe Parade
  • Vidhan Bhavan
  • Churchgate ๐Ÿš† Western line
  • Hutatma Chowk
  • CSMT ๐Ÿš† Central & Harbour lines
  • Kalbadevi
  • Girgaon
  • Grant Road ๐Ÿš† Western line
  • Mumbai Central ๐Ÿš† Western line
  • Mahalaxmi ๐Ÿš† Western line
  • Science Centre
  • Acharya Atre Chowk
  • Worli
  • Siddhivinayak
  • Dadar ๐Ÿš† Western & Central lines
  • Shitaladevi Mandir
  • Dharavi
  • BKC โ“‚ Line 2B (planned)
  • Bandra Colony
  • Santacruz ๐Ÿš† Western line (skywalk)
  • Airport T1 โœˆ๏ธ Terminal 1
  • Sahar Road
  • Airport T2 โœˆ๏ธ Terminal 2 ยท โ“‚ Line 7A (planned)
  • Marol Naka โ“‚ Line 1
  • MIDCโ€“Andheri
  • SEEPZ
  • Aarey JVLR โ“‚ Line 6 (planned) ยท Depot

Full station list

#StationStatusInterchange
1Cuffe ParadeOperationalโ€“
2Vidhan BhavanOperationalโ€“
3ChurchgateOperationalChurchgate (Western line)
4Hutatma ChowkOperationalโ€“
5CSMTOperationalCSMT (Central, Harbour, long-distance)
6KalbadeviOperationalโ€“
7GirgaonOperationalโ€“
8Grant RoadOperationalGrant Road (Western line)
9Mumbai CentralOperationalMumbai Central (Western line, long-distance)
10MahalaxmiOperationalMahalaxmi (Western line)
11Science CentreOperationalโ€“
12Acharya Atre ChowkOperationalโ€“
13WorliOperationalโ€“
14SiddhivinayakOperationalโ€“
15DadarOperationalDadar (Western and Central lines)
16Shitaladevi MandirOperationalโ€“
17DharaviOperationalโ€“
18BKCOperationalLine 2B โ€“ planned
19Bandra ColonyOperationalโ€“
20SantacruzOperationalSantacruz (Western line, via skywalk)
21Airport T1OperationalAirport Terminal 1
22Sahar RoadOperationalโ€“
23Airport T2OperationalAirport Terminal 2; Line 7A โ€“ planned
24Marol NakaOperationalLine 1 (Blue Line)
25MIDCโ€“AndheriOperationalโ€“
26SEEPZOperationalโ€“
27Aarey JVLROperationalLine 6 โ€“ planned

Timings & fare

ItemDetails
First train5:55 AM from both ends
Last trainDeparts around 10:30 PM
FareDistance-based, โ‚น10 to โ‚น70 end to end
Journey timeAbout 45 minutes between the airport and Cuffe Parade
OperatorMumbai Metro Rail Corporation (MMRC)

Tickets are sold at station counters and ticket machines, and through official digital ticketing options โ€” check MMRC’s website for the current ones. Several stations carry sponsor names (for example, banks) in announcements and on maps, but the station names above are the official ones.

Interchange stations

CSMT

๐Ÿš† Central & Harbour lines

Change for Central and Harbour line local trains and long-distance trains from Chhatrapati Shivaji Maharaj Terminus.

Dadar

๐Ÿš† Western & Central lines

One of the busiest interchanges in the city, with both Western and Central line local trains.

Churchgate

๐Ÿš† Western line

Southern end of the Western line, for offices around Churchgate and Nariman Point.

Airport T1 & T2

โœˆ๏ธ Airport

Direct metro access to both terminals of Chhatrapati Shivaji Maharaj International Airport.

Marol Naka

โ“‚ Line 1

Change to Line 1 (Blue Line) for Andheri, Ghatkopar and Versova.

BKC

โ“‚ Line 2B (planned)

For the Bandra Kurla Complex business district; future interchange with Line 2B and the bullet train station.

Plan your trip

Airport to south Mumbai

  1. Board at Airport T1 or T2
  2. Ride towards Cuffe Parade
  3. Get off at Churchgate, CSMT or Cuffe Parade โ€” about 45 minutes

From Andheri / Ghatkopar

  1. Take Line 1 to Marol Naka
  2. Change to Line 3
  3. Ride south towards BKC, Dadar or south Mumbai

Route map

See also: Mumbai Metro map โ€“ all lines

Timeline

  • 2013Mumbai Metro Rail Corporation is set up to build the Colaba โ€“ Bandra โ€“ SEEPZ line.
  • 2016 โ€“ 2017Construction and tunnelling begin.
  • 7 October 2024Phase 1 (Aarey JVLR โ€“ BKC, 10 stations) opens.
  • 10 May 2025Phase 2A (Dharavi โ€“ Acharya Atre Chowk) opens.
  • 9 October 2025Final phase (Science Centre โ€“ Cuffe Parade) opens; the line is fully operational.

About Metro Line 3

Route explained

Line 3 runs entirely underground except for its northern terminus at Aarey JVLR. From Cuffe Parade it passes Mantralaya and Vidhan Bhavan, Churchgate and Fort, CSMT, Kalbadevi and Girgaon, then Mumbai Central, Mahalaxmi, Worli and Siddhivinayak to Dadar. It continues through Dharavi to BKC, Santacruz and both airport terminals, then the Andheri (East) business areas around Marol and SEEPZ to Aarey.

It is the first metro line to directly connect south Mumbai, the business districts and the airport.

Station sponsor names

Mumbai Metro Rail Corporation sold naming rights for several stations, so you may hear sponsor names (for example, banks or insurers) before the station name in announcements and on maps. The official station names are the ones listed above.

Construction & cost

Line 3 was built by Mumbai Metro Rail Corporation (MMRC), a joint venture of the Government of India and the Government of Maharashtra. Twin tunnels were bored under some of the densest parts of the city, and the project cost is estimated at over โ‚น30,000 crore. The car depot at Aarey Colony was one of the most debated parts of the project.

Project & technical details
ItemDetails
Length33.5 km
Stations27 (26 underground, 1 at-grade)
Line colourAqua
Built byMMRC
DepotAarey
RidershipAbout 1.5 lakh per day (October 2025)

Frequently asked questions

Is Mumbai Metro Line 3 fully operational?

Yes. All 27 stations from Cuffe Parade to Aarey JVLR have been open since 9 October 2025.

What are the Line 3 timings?

The first trains leave both ends at 5:55 AM, and the last trains depart at around 10:30 PM.

What is the fare on Metro Line 3?

Fares are distance-based, from โ‚น10 up to about โ‚น70 for the full Cuffe Parade โ€“ Aarey JVLR journey.

Does Metro Line 3 go to the airport?

Yes. It has stations at both Airport Terminal 1 and Terminal 2. The ride from the airport to Cuffe Parade takes about 45 minutes.

How many stations are there on Line 3?

27 stations, 26 of them underground.

Where can I change from Line 3 to local trains?

At Churchgate, Grant Road, Mumbai Central, Mahalaxmi and Santacruz for the Western line; at CSMT for the Central and Harbour lines; and at Dadar for both Western and Central lines.

Where can I change from Line 3 to other metro lines?

At Marol Naka for Line 1 (Blue Line). Future interchanges are planned with Line 2B at BKC, Line 7A at Airport T2 and Line 6 at Aarey JVLR.

Why do some Line 3 stations have bank names?

Several stations have sponsor naming rights, so a brand name is added before the station name in announcements. The official names are unchanged.

Who operates Line 3?

Mumbai Metro Rail Corporation (MMRC), with Delhi Metro Rail Corporation contracted for operations.