Trending Today
- Tragic Fire Incidents in Mumbai: One Fatality in Dadar’s Raintree Building and Seven Lives Lost in Heera Panna Mall Blaze
- Western Railway to Run Special Local Trains and Halt UP Fast Trains During Ganapati Visarjan
- Mumbai Airport Announces Temporary Closure of Both Runways for Post-Monsoon Maintenance on October 17
- India’s iPhonе 15 Frеnzy: Ahmеdabad Man’s 17-Hour Wait in Mumbai
- Big Fire at Heera Panna Mall in Mumbai: 14 People rescued
- Last Updated On: August 29, 2023
Mumbai is going through one of the most significant infrastructure development projects, Mumbai Metro. It is a crucial and ambitious project for Mumbai, owned and supervised by MMRDA. With new metro lines, many areas of Mumbai will be more interconnected with each other sooner.
In the below Mumbai metro route map, we have covered and tagged all Mumbai metro train routes and stations. Each Mumbai metro route shows the correct station name and proper location on the map.
Currently, only the Mumbai Metro Line 1 (Blue Line), Mumbai Metro Line 7 and Mumbai Metro Line 2A are fully operational. 12 more lines are currently under construction.
If you find any issue or need any correction to the map, please let us know.
Below we have covered all Mumbai metro route maps, which are currently operational and planned.
Mumbai Metro Lines Details
Metro Line | Name of Corridor | Colour | Stations | Length (KM) | Status |
---|---|---|---|---|---|
Mumbai Metro Line 1 | Versova – Andheri – Ghatkopar | Blue Line | 12 | 11.4 | Fully Operational |
Mumbai Metro Line 2A | Dahisar(E) – Andheri West | Yellow Line | 17 | 18.6 | Fully Operational |
Mumbai Metro Line 2B | Andheri West – Mandala | Yellow Line | 22 | 23.6 | Under Construction |
Mumbai Metro Line 3 | Colaba – Bandra – SEEPZ | Aqua Line | 27 | 33.5 | Under Construction |
Mumbai Metro Line 4 | Wadala – Mulund – Thane – Kasarvadavali | Green Line | 32 | 32.32 | Under Construction |
Mumbai Metro Line 4A | Kasarwadavali – Gaimukh | Green Line | 2 | 2.88 | Under Construction |
Mumbai Metro Line 5 | Thane – Bhiwandi – Kalyan | Orange Line | 17 | 24.9 | Under Construction |
Mumbai Metro Line 6 | Swami Samarth Nagar – KanjurMarg – Vikhroli | Pink Line | 13 | 14.7 | Under Construction |
Mumbai Metro Line 7 | Dahisar (East) – Gundavali | Red Line | 13 | 16.5 | Fully Operational |
Mumbai Metro Line 7A | Andheri (E) – CSI Airport | Red Line | 2 | 3.17 | Under Construction |
Line-8 | CSIA – NMIA | Gold Line | 7 | 35 | Proposed |
Mumbai Metro Line 9 | Dahisar (E) – Mira Bhayander | Red Line | 8 | 11.38 | Under Construction |
Line-10 | Gaimukh – Shivaji Chowk (Mira Road) | Green Line | 9 | 9.2 | Approved |
Line-11 | Wadala – Chhattrapati Shivaji Maharaj Terminus | Green Line | 11 | 12.7 | Approved |
Line-12 | Kalyan – Dombivali – Taloja | Orange Line | 17 | 20.7 | Approved |
Line-13 | Shivaji Chowk (Mira Bhayander) – Virar | Purple Line | 20 | 23 | Proposed |
Line-14 | Kanjurmarg – Badlapur | Magenta Line | 40 | 45 | Proposed |
Mumbai Metro Map 2023- All Lines
Below Mumbai metro route map covers all Mumbai metro lines with detail of stations located on the map.
If you think, it’s helpful, then please help to share with others.
Map will be updated soon.
Map will be updated soon.
Map will be updated soon.
Navi Mumbai Metro Map 2023
The below map cover only Line 1 (Phase-1) for Navi Mumbai Metro Map. Other phases will be updated soon