web analytics

Mumbai Metro Line 2A (Yellow Line): Route, Stations, Timings, Fare & Status

Extra Metro Services on Line 2A and 7 for Navratri Celebration in Mumbai

Part of our Mumbai Metro guide — every line, fare, timing and status update in one place.

Mumbai Metro Line 2A (Yellow Line) is an 18.6 km elevated metro line running north–south along Link Road in Mumbai’s western suburbs, from Dahisar (East) to Andheri (West), through Borivali, Kandivali, Malad, Goregaon and Oshiwara. All 17 stations are open.

Fully operational · Dahisar (East) – Andheri (West)

Timings

5:55 AM – 11:00 PM

Frequency

Every 5–8 min

Fare

From ₹10

Stations

17, all open

Last checked: October 2026 · Timings and fares can change — confirm on MMMOCL’s app or website.

Line 2A route & stations

All 17 stations are Operational · Ⓜ Metro interchange

  • Dahisar (East) Ⓜ Line 7 (Red) · Ⓜ Line 9
  • Anand Nagar formerly Upper Dahisar
  • Kandarpada
  • Mandapeshwar
  • Eksar
  • Borivali (West)
  • Shimpoli formerly Pahadi Eksar
  • Kandivali (West)
  • Dahanukarwadi
  • Valnai–Meeth Chowky formerly Valnai
  • Malad (West)
  • Lower Malad
  • Bangur Nagar formerly Pahadi Goregaon
  • Goregaon (West)
  • Oshiwara
  • Lower Oshiwara Ⓜ Line 6 (planned)
  • Andheri (West) Ⓜ Line 1 at D.N. Nagar

Full station list

#StationStatusInterchange
1Dahisar (East)OperationalLine 7, Line 9
2Anand NagarOperational–
3KandarpadaOperational–
4MandapeshwarOperational–
5EksarOperational–
6Borivali (West)Operational–
7ShimpoliOperational–
8Kandivali (West)Operational–
9DahanukarwadiOperational–
10Valnai–Meeth ChowkyOperational–
11Malad (West)Operational–
12Lower MaladOperational–
13Bangur NagarOperational–
14Goregaon (West)Operational–
15OshiwaraOperational–
16Lower OshiwaraOperationalLine 6 – planned
17Andheri (West)OperationalLine 1 (D.N. Nagar), Line 2B – planned

Timings & fare

ItemDetails
First trainAround 5:55 AM
Last trainAround 11:00 PM
FrequencyAbout every 5–8 minutes
FareDistance-based, from ₹10, in steps of ₹10
OperatorMMMOCL (same as Line 7, 2B and 9)

Tickets are sold at station counters and ticket machines. Check the official MMMOCL app for mobile tickets, travel cards and the exact fare between two stations. Timings may differ on Sundays and during festivals.

Interchange stations

Dahisar (East)

Ⓜ Line 7 · Ⓜ Line 9

Northern terminus and a three-line hub. Change to Line 7 for the Western Express Highway and Andheri (East), or Line 9 for Mira-Bhayandar.

Andheri (West)

Ⓜ Line 1 at D.N. Nagar

Southern terminus. Change to Line 1 (Blue Line) for Versova, Andheri station and Ghatkopar. Line 2B will continue from here towards Bandra and BKC.

Lower Oshiwara

Ⓜ Line 6 (planned)

Future interchange with Line 6 (Swami Samarth Nagar – Vikhroli) once it opens.

Plan your trip

To Andheri station & Ghatkopar

  1. Take Line 2A to Andheri (West)
  2. Change to Line 1 at D.N. Nagar
  3. Line 1 towards Andheri and Ghatkopar

To Mira-Bhayandar

  1. Take Line 2A to Dahisar (East)
  2. Change to Line 9
  3. Line 9 towards Mira-Bhayandar

Route map

See also: Mumbai Metro map – all lines

Timeline

  • 2015MMRDA approves the Dahisar – D.N. Nagar corridor; foundation stone laid in October.
  • November 2016Construction begins.
  • 2019 – 2021Original deadlines missed; the COVID-19 pandemic delays work further. Trial runs begin in May 2021.
  • 2 April 2022Phase 1 (Dahisar East – Dahanukarwadi, 9 stations) opens together with Line 7.
  • 19 January 2023Phase 2 (Valnai–Meeth Chowky – Andheri West, 8 stations) opens; the line is fully operational.
  • April 2026Line 9 opens from Dahisar (East), making it a three-line interchange.

About Metro Line 2A

Route explained

Line 2A runs almost entirely along Link Road, parallel to the Western Railway and to Line 7 on the Western Express Highway. It starts at Dahisar (East), passes Anand Nagar, Kandarpada and Mandapeshwar, then serves Borivali (West), Kandivali (West), Malad (West), Goregaon (West) and the Oshiwara–Lokhandwala area before ending at Andheri (West) near D.N. Nagar.

Together with Line 7, it gives the western suburbs two north–south metro corridors as an alternative to crowded local trains and the congested Link Road and S.V. Road.

Line 2A vs Line 7 vs Line 2B
Line 2ALine 7Line 2B
RouteDahisar (E) – Andheri (W)Dahisar (E) – GundavaliD.N. Nagar – Mandale
CorridorLink RoadWestern Express HighwayAndheri (W) – Bandra – BKC – Chembur
Length18.6 km16.5 km23.6 km
Stations171420
StatusFully openFully openMandale – Chembur open

Line 2A and Line 2B together form the full Yellow Line. See Metro Line 2B and Metro Line 7.

Depot, trains & signalling

Line 2A trains are maintained at the Charkop depot (about 16 hectares), which it shares with Line 7. The line uses six-coach, India-built BEML stainless-steel trains with regenerative braking, each carrying around 1,660 passengers, and Alstom CBTC signalling.

Construction history

Line 2A was planned as part of a Dahisar – Bandra – Mankhurd Line 2, later split into Line 2A (Dahisar – D.N. Nagar) and Line 2B (D.N. Nagar – Mandale). Construction began in November 2016 at an estimated cost of about ₹6,410 crore, funded partly by the state government and partly by an Asian Development Bank loan. After missing its 2019 and 2020 targets, the line opened in two phases in April 2022 and January 2023.

Project & technical details
ItemDetails
Length18.6 km, fully elevated
Stations17
Line colourYellow
Project authorityMMRDA
OperatorMMMOCL
Estimated cost₹6,410 crore
DepotCharkop
Trains6-coach BEML
SignallingAlstom CBTC
Electrification25 kV AC overhead
RidershipAbout 2.1 lakh per day (2023)

Frequently asked questions

Is Mumbai Metro Line 2A fully operational?

Yes. All 17 stations from Dahisar (East) to Andheri (West) have been open since January 2023.

What are the Line 2A timings?

Trains run from about 5:55 AM to about 11:00 PM, roughly every 5–8 minutes. Timings can change on Sundays and during festivals, so check the MMMOCL app before travelling.

What is the fare on Metro Line 2A?

Fares are distance-based and start at ₹10, rising in steps of ₹10 with distance. Check the MMMOCL app for the exact fare between two stations.

How many stations are there on Line 2A?

17 elevated stations, from Dahisar (East) to Andheri (West).

Where can I change from Line 2A to other metro lines?

At Dahisar (East) for Line 7 (Red Line) and Line 9 to Mira-Bhayandar, and at Andheri (West) for Line 1 (Blue Line) at D.N. Nagar.

Which Line 2A stations were renamed?

Upper Dahisar is now Anand Nagar, Pahadi Eksar is now Shimpoli, Valnai is now Valnai–Meeth Chowky, and Pahadi Goregaon is now Bangur Nagar.

Is Line 2A the same as Line 2B?

They are two halves of the same Yellow Line. Line 2A runs from Dahisar (East) to Andheri (West), and Line 2B will continue from D.N. Nagar to Mandale via Bandra, BKC and Chembur.

What is the difference between Line 2A and Line 7?

Both run north–south from Dahisar (East). Line 2A runs along Link Road in the western suburbs to Andheri (West); Line 7 runs along the Western Express Highway to Gundavali in Andheri (East).

How long is Metro Line 2A?

About 18.6 km, fully elevated.

Who operates Line 2A?

Maha Mumbai Metro Operation Corporation Ltd (MMMOCL). MMRDA is the project authority.

Other metro lines

Sources: Wikipedia – Yellow Line · Housing.com · Kissht – Mumbai Metro timings 2026 · MMMOCL