Part of our Mumbai Metro guide โ every line, fare, timing and status update in one place.
This Mumbai Metro map shows every metro line in Mumbai โ what’s running, what’s opening next and what’s planned โ with station counts, routes and links to a detailed guide for each line. It is updated for October 2026, after Line 3 (Aqua Line) fully opened and Lines 2B and 9 partly opened.
4 lines fully open ยท 2 lines partly open
Operational length
About 92 km
Stations open
About 79
Daily riders
About 10 lakh
Fare
From โน10
Last updated: October 2026 ยท Figures are approximate; check official operator apps for timings and fares.
Mumbai Metro map 2026

Interactive map by line
All Mumbai Metro lines at a glance
| Line | Colour | Route | Km | Stations | Status |
|---|---|---|---|---|---|
| Line 1 | Blue | Versova โ Andheri โ Ghatkopar | 11.4 | 12 | Operational |
| Line 2A | Yellow | Dahisar (E) โ Andheri (W) | 18.6 | 17 | Operational |
| Line 2B | Yellow | D.N. Nagar โ BKC โ Mandale | 23.6 | 20 | Partially open Mandale โ Chembur |
| Line 3 | Aqua | Cuffe Parade โ BKC โ Aarey JVLR | 33.5 | 27 | Operational |
| Line 4 | Green | Wadala โ Ghatkopar โ Thane โ Kasarvadavali | 32.3 | 32 | Under construction |
| Line 4A | Green | Kasarvadavali โ Gaimukh | 2.9 | 2 | Under construction |
| Line 5 | Orange | Thane โ Bhiwandi โ Kalyan | 23.5 | 17 | Under construction (Thane โ Bhiwandi) |
| Line 6 | Pink | Swami Samarth Nagar โ JVLR โ Vikhroli | 14.5 | 13 | Under construction |
| Line 7 | Red | Dahisar (E) โ Gundavali (Andheri E) | 16.5 | 14 | Operational |
| Line 7A | Red | Gundavali โ Airport T2 | 3.2 | 2 | Under construction |
| Line 8 | Gold | Mumbai Airport โ Navi Mumbai Airport | ~35 | 20 | Approved (Jan 2025) |
| Line 9 | Red | Dahisar (E) โ Mira-Bhayandar | ~9 | 7 | Partially open Dahisar (E) โ Kashigaon |
| Line 10 | Green | Gaimukh โ Shivaji Chowk (Mira Road) | 9.2 | 8 | Proposed |
| Line 11 | Green | Wadala โ CSMT | ~18 | 15 | Proposed |
| Line 12 | Orange | Kalyan โ Taloja | 23.6 | 19 | Under construction |
| Line 12A | Orange | Manpada (Katai Naka) โ Kalyan Phata โ Amandoot (Kharghar) | 18.4 | 12 | Approved (Oct 2026) |
| Line 13 | Purple | Mira-Bhayandar โ Virar | 23 | 20 | Proposed |
| Line 14 | Magenta | Vikhroli โ Badlapur | 45 | 40 | Proposed |
Lengths and station counts are for the full planned line. Tap a line name for its detailed guide with stations, timings and fares.
Lines running now
Line 1 ยท Blue
Mumbai’s first metro (2014), running eastโwest across Andheri. Connects with Western line at Andheri and Central line at Ghatkopar.
Line 2A ยท Yellow
Northโsouth along Link Road through Borivali, Kandivali, Malad and Goregaon.
Line 3 ยท Aqua
Fully underground through south Mumbai, Dadar, BKC and both airport terminals. Fully open since October 2025.
Line 7 ยท Red
Northโsouth along the Western Express Highway through Borivali (E), Malad (E) and Goregaon (E).
Line 2B ยท Yellow
Eastern section open since 2026, with interchange to the Harbour line at Chembur and Mankhurd.
Line 9 ยท Red
First phase towards Mira-Bhayandar opened in April 2026, continuing from Line 7.
Opening next
| Project | What’s opening | Expected |
|---|---|---|
| Line 4 & 4A | Gaimukh โ Cadbury Junction, Thane (about 10.5 km, 8 stations) | Around end of 2026, after safety clearance |
| Line 9 | Kashigaon โ Subhash Chandra Bose Stadium (Bhayandar) | Late 2026 |
| Line 7A | Gundavali โ Airport Terminal 2 | 2027 |
| Line 2B | D.N. Nagar โ Saraswat Nagar, then Saraswat Nagar โ Chembur via BKC | By 2028 (official target) |
| Line 6 | Swami Samarth Nagar โ Vikhroli along JVLR | By 2028 (official target) |
| Mumbai Monorail | Restart of Chembur โ Sant Gadge Maharaj Chowk after upgrade | Date awaited |
Opening dates are official targets reported in the news and often shift. We update this page as lines open.
Major interchange stations
| Station | Change between |
|---|---|
| Dahisar (East) | Line 2A, Line 7, Line 9 |
| Andheri (West) / D.N. Nagar | Line 2A, Line 1 |
| Gundavali / Western Express Highway | Line 7, Line 1 |
| Marol Naka | Line 3, Line 1 |
| Andheri | Line 1, Western line |
| Ghatkopar | Line 1, Central line |
| Dadar | Line 3, Western and Central lines |
| CSMT / Churchgate | Line 3, Central, Harbour and Western lines |
| Chembur | Line 2B, Harbour line, Monorail (when running) |
| Mankhurd | Line 2B, Harbour line |
Navi Mumbai Metro
Navi Mumbai Metro is a separate network built by CIDCO. Its Line 1 runs 11.1 km from CBD Belapur to Pendhar through Kharghar and Taloja, with 11 stations, and has been open since November 2023. Fares range from โน10 to โน30. Extensions towards Khandeshwar and the Navi Mumbai International Airport are planned, and the proposed Line 8 (Gold Line) would link it with Mumbai’s airport. Use the “Navi Mumbai Metro” button in the interactive map above to see its stations.
Mumbai Metro timeline
- June 2014Line 1 (Versova โ Ghatkopar) opens โ Mumbai’s first metro.
- April 2022First phases of Line 2A and Line 7 open.
- January 2023Lines 2A and 7 fully open.
- November 2023Navi Mumbai Metro Line 1 opens.
- October 2024Line 3 opens from Aarey JVLR to BKC.
- May 2025Line 3 extended to Acharya Atre Chowk (Worli).
- October 2025Line 3 fully open to Cuffe Parade.
- April 2026Line 2B (Mandale โ Diamond Garden) and Line 9 (Dahisar East โ Kashigaon) open.
- August 2026Line 2B extended to Chembur.
- NextLine 4/4A first stretch in Thane, Line 9 to Bhayandar, Line 7A to the airport.
Upcoming events in Mumbai
- 27NOVDiljit Dosanjh โ Aura India Tour, Mumbai
- 8โ9DECFred again.. โ Mumbai
- 12โ13DECRolling Loud India 2026
- 18โ19DECSunburn Festival Mumbai 2026
Frequently asked questions
How many Mumbai Metro lines are operational?
Four lines are fully operational โ Line 1 (Blue), Line 2A (Yellow), Line 3 (Aqua) and Line 7 (Red) โ and two are partly open: Line 2B (Mandale โ Chembur) and Line 9 (Dahisar East โ Kashigaon).
How long is the operational Mumbai Metro network?
About 92 km with around 79 stations, as of October 2026. The full planned network is about 337 km.
Which Mumbai Metro line goes to the airport?
Line 3 (Aqua Line) stops at both Airport Terminal 1 and Terminal 2. Line 7A, an extension of Line 7 to Terminal 2, is under construction.
Which metro line connects south Mumbai?
Line 3 (Aqua Line), which runs underground from Cuffe Parade via Churchgate, CSMT, Mumbai Central and Dadar to BKC, the airport and Aarey.
Where can I change between metro lines?
Main interchanges are Dahisar (East) for Lines 2A, 7 and 9; Andheri (West)/D.N. Nagar for Lines 2A and 1; Gundavali/WEH for Lines 7 and 1; and Marol Naka for Lines 3 and 1.
When will Metro Line 4 open?
The first stretch of Line 4 and 4A, between Gaimukh and Cadbury Junction in Thane (about 10.5 km, 8 stations), is expected to open around the end of 2026 after final safety clearances.
Is the Mumbai Monorail running?
The Monorail between Chembur and Sant Gadge Maharaj Chowk has been shut since September 2025 for a safety and signalling upgrade. A restart was expected in 2026, but check for the latest announcement.
What are Mumbai Metro timings?
Most lines run from around 5:30โ6:00 AM to around 10:30โ11:00 PM. Exact timings vary by line โ see each line’s page for details.
What is the Mumbai Metro fare?
Fares are distance-based and start at โน10 on all lines. Line 3 costs up to about โน70 end to end.
Is Navi Mumbai Metro part of Mumbai Metro?
No. Navi Mumbai Metro is a separate network run by CIDCO. Its Line 1 runs from CBD Belapur to Pendhar (11.1 km, 11 stations).
Sources: Wikipedia โ Mumbai Metro ยท Free Press Journal โ Metro 4 ยท Free Press Journal โ Monorail ยท Wikipedia โ Navi Mumbai Metro Line 1