Mumbai Metro Map 2026: All Lines, Routes, Stations & Status

Mumbai Metro map 2026 showing operational, under-construction and approved lines including Line 8 Gold and Line 12A

Part of our Mumbai Metro guide โ€” every line, fare, timing and status update in one place.

This Mumbai Metro map shows every metro line in Mumbai โ€” what’s running, what’s opening next and what’s planned โ€” with station counts, routes and links to a detailed guide for each line. It is updated for October 2026, after Line 3 (Aqua Line) fully opened and Lines 2B and 9 partly opened.

4 lines fully open ยท 2 lines partly open

Operational length

About 92 km

Stations open

About 79

Daily riders

About 10 lakh

Fare

From โ‚น10

Last updated: October 2026 ยท Figures are approximate; check official operator apps for timings and fares.

Mumbai Metro map 2026

Mumbai Metro map 2026 showing all operational and upcoming metro lines, stations and interchanges in Mumbai, Thane and Navi Mumbai
Mumbai Metro Map 2026: running lines are solid, lines under construction are dashed and proposed lines are dotted. Tap the map to open the full-size version.

Interactive map by line

Tap a line above to open its interactive map with every station marked.
Previous Mumbai Metro map (2022)
Mumbai Metro map showing all metro lines and routes
Earlier Mumbai Metro route map (2022).

All Mumbai Metro lines at a glance

LineColourRouteKmStationsStatus
Line 1BlueVersova โ€“ Andheri โ€“ Ghatkopar11.412Operational
Line 2AYellowDahisar (E) โ€“ Andheri (W)18.617Operational
Line 2BYellowD.N. Nagar โ€“ BKC โ€“ Mandale23.620Partially open Mandale โ€“ Chembur
Line 3AquaCuffe Parade โ€“ BKC โ€“ Aarey JVLR33.527Operational
Line 4GreenWadala โ€“ Ghatkopar โ€“ Thane โ€“ Kasarvadavali32.332Under construction
Line 4AGreenKasarvadavali โ€“ Gaimukh2.92Under construction
Line 5OrangeThane โ€“ Bhiwandi โ€“ Kalyan23.517Under construction (Thane โ€“ Bhiwandi)
Line 6PinkSwami Samarth Nagar โ€“ JVLR โ€“ Vikhroli14.513Under construction
Line 7RedDahisar (E) โ€“ Gundavali (Andheri E)16.514Operational
Line 7ARedGundavali โ€“ Airport T23.22Under construction
Line 8GoldMumbai Airport โ€“ Navi Mumbai Airport~3520Approved (Jan 2025)
Line 9RedDahisar (E) โ€“ Mira-Bhayandar~97Partially open Dahisar (E) โ€“ Kashigaon
Line 10GreenGaimukh โ€“ Shivaji Chowk (Mira Road)9.28Proposed
Line 11GreenWadala โ€“ CSMT~1815Proposed
Line 12OrangeKalyan โ€“ Taloja23.619Under construction
Line 12AOrangeManpada (Katai Naka) โ€“ Kalyan Phata โ€“ Amandoot (Kharghar)18.412Approved (Oct 2026)
Line 13PurpleMira-Bhayandar โ€“ Virar2320Proposed
Line 14MagentaVikhroli โ€“ Badlapur4540Proposed

Lengths and station counts are for the full planned line. Tap a line name for its detailed guide with stations, timings and fares.

Lines running now

Line 1 ยท Blue

Versova โ€“ Ghatkopar ยท 12 stations

Mumbai’s first metro (2014), running eastโ€“west across Andheri. Connects with Western line at Andheri and Central line at Ghatkopar.

Line 1 guide โ†’

Line 2A ยท Yellow

Dahisar (E) โ€“ Andheri (W) ยท 17 stations

Northโ€“south along Link Road through Borivali, Kandivali, Malad and Goregaon.

Line 2A guide โ†’

Line 3 ยท Aqua

Cuffe Parade โ€“ Aarey JVLR ยท 27 stations

Fully underground through south Mumbai, Dadar, BKC and both airport terminals. Fully open since October 2025.

Line 3 guide โ†’

Line 7 ยท Red

Dahisar (E) โ€“ Gundavali ยท 14 stations

Northโ€“south along the Western Express Highway through Borivali (E), Malad (E) and Goregaon (E).

Line 7 guide โ†’

Line 2B ยท Yellow

Partly open: Mandale โ€“ Chembur ยท 6 stations

Eastern section open since 2026, with interchange to the Harbour line at Chembur and Mankhurd.

Line 2B guide โ†’

Line 9 ยท Red

Partly open: Dahisar (E) โ€“ Kashigaon

First phase towards Mira-Bhayandar opened in April 2026, continuing from Line 7.

Line 9 guide โ†’

Opening next

ProjectWhat’s openingExpected
Line 4 & 4AGaimukh โ€“ Cadbury Junction, Thane (about 10.5 km, 8 stations)Around end of 2026, after safety clearance
Line 9Kashigaon โ€“ Subhash Chandra Bose Stadium (Bhayandar)Late 2026
Line 7AGundavali โ€“ Airport Terminal 22027
Line 2BD.N. Nagar โ€“ Saraswat Nagar, then Saraswat Nagar โ€“ Chembur via BKCBy 2028 (official target)
Line 6Swami Samarth Nagar โ€“ Vikhroli along JVLRBy 2028 (official target)
Mumbai MonorailRestart of Chembur โ€“ Sant Gadge Maharaj Chowk after upgradeDate awaited

Opening dates are official targets reported in the news and often shift. We update this page as lines open.

Major interchange stations

StationChange between
Dahisar (East)Line 2A, Line 7, Line 9
Andheri (West) / D.N. NagarLine 2A, Line 1
Gundavali / Western Express HighwayLine 7, Line 1
Marol NakaLine 3, Line 1
AndheriLine 1, Western line
GhatkoparLine 1, Central line
DadarLine 3, Western and Central lines
CSMT / ChurchgateLine 3, Central, Harbour and Western lines
ChemburLine 2B, Harbour line, Monorail (when running)
MankhurdLine 2B, Harbour line

Navi Mumbai Metro is a separate network built by CIDCO. Its Line 1 runs 11.1 km from CBD Belapur to Pendhar through Kharghar and Taloja, with 11 stations, and has been open since November 2023. Fares range from โ‚น10 to โ‚น30. Extensions towards Khandeshwar and the Navi Mumbai International Airport are planned, and the proposed Line 8 (Gold Line) would link it with Mumbai’s airport. Use the “Navi Mumbai Metro” button in the interactive map above to see its stations.

Mumbai Metro timeline

  • June 2014Line 1 (Versova โ€“ Ghatkopar) opens โ€” Mumbai’s first metro.
  • April 2022First phases of Line 2A and Line 7 open.
  • January 2023Lines 2A and 7 fully open.
  • November 2023Navi Mumbai Metro Line 1 opens.
  • October 2024Line 3 opens from Aarey JVLR to BKC.
  • May 2025Line 3 extended to Acharya Atre Chowk (Worli).
  • October 2025Line 3 fully open to Cuffe Parade.
  • April 2026Line 2B (Mandale โ€“ Diamond Garden) and Line 9 (Dahisar East โ€“ Kashigaon) open.
  • August 2026Line 2B extended to Chembur.

Frequently asked questions

How many Mumbai Metro lines are operational?

Four lines are fully operational โ€” Line 1 (Blue), Line 2A (Yellow), Line 3 (Aqua) and Line 7 (Red) โ€” and two are partly open: Line 2B (Mandale โ€“ Chembur) and Line 9 (Dahisar East โ€“ Kashigaon).

How long is the operational Mumbai Metro network?

About 92 km with around 79 stations, as of October 2026. The full planned network is about 337 km.

Which Mumbai Metro line goes to the airport?

Line 3 (Aqua Line) stops at both Airport Terminal 1 and Terminal 2. Line 7A, an extension of Line 7 to Terminal 2, is under construction.

Which metro line connects south Mumbai?

Line 3 (Aqua Line), which runs underground from Cuffe Parade via Churchgate, CSMT, Mumbai Central and Dadar to BKC, the airport and Aarey.

Where can I change between metro lines?

Main interchanges are Dahisar (East) for Lines 2A, 7 and 9; Andheri (West)/D.N. Nagar for Lines 2A and 1; Gundavali/WEH for Lines 7 and 1; and Marol Naka for Lines 3 and 1.

When will Metro Line 4 open?

The first stretch of Line 4 and 4A, between Gaimukh and Cadbury Junction in Thane (about 10.5 km, 8 stations), is expected to open around the end of 2026 after final safety clearances.

Is the Mumbai Monorail running?

The Monorail between Chembur and Sant Gadge Maharaj Chowk has been shut since September 2025 for a safety and signalling upgrade. A restart was expected in 2026, but check for the latest announcement.

What are Mumbai Metro timings?

Most lines run from around 5:30โ€“6:00 AM to around 10:30โ€“11:00 PM. Exact timings vary by line โ€” see each line’s page for details.

What is the Mumbai Metro fare?

Fares are distance-based and start at โ‚น10 on all lines. Line 3 costs up to about โ‚น70 end to end.

Is Navi Mumbai Metro part of Mumbai Metro?

No. Navi Mumbai Metro is a separate network run by CIDCO. Its Line 1 runs from CBD Belapur to Pendhar (11.1 km, 11 stations).

Sources: Wikipedia โ€“ Mumbai Metro ยท Free Press Journal โ€“ Metro 4 ยท Free Press Journal โ€“ Monorail ยท Wikipedia โ€“ Navi Mumbai Metro Line 1