web analytics

Mumbai Metro Timings 2026: First & Last Train for Every Line

Mumbai Metro train

Part of our Mumbai Metro guide โ€” every line, fare, timing and status update in one place.

Mumbai Metro timings at a glance: most lines start between 5:30 and 6:00 AM, and the last trains leave between 10:15 and 11:50 PM. Line 1 (Versova โ€“ Ghatkopar) runs the latest, with its last train from Ghatkopar at 11:50 PM. This page lists the first and last train, peak frequency and operator for every line now running, plus festival and holiday timings.

6 metro lines running in Mumbai ยท Navi Mumbai Line 1

Earliest first train

5:30 AM (Line 1)

Latest last train

11:50 PM (Line 1, Ghatkopar)

Most frequent

Line 1, about every 3โ€“4 min

Monorail

Suspended

Last checked: November 2026 ยท Timings change for maintenance and festivals โ€” confirm in the operatorโ€™s app before late-night travel.

Mumbai Metro timings: all lines at a glance

LineRouteFirst trainLast trainPeak frequency
Line 1 ยท BlueVersova โ€“ Andheri โ€“ Ghatkopar5:30 AM11:25 PM from Versova ยท 11:50 PM from GhatkoparAbout every 3โ€“4 min
Line 2A ยท YellowDahisar (E) โ€“ Andheri (W)5:50 AMAbout 10:35 โ€“ 11:00 PMAbout every 6 min
Line 7 + Line 9 ยท RedGundavali (Andheri E) โ€“ Dahisar (E) โ€“ Kashigaon5:50 AMAbout 11:00 PMAbout every 6 min
Line 2B ยท YellowMandale โ€“ Chembur6:00 AMAbout 10:15 โ€“ 10:30 PMAbout every 9โ€“10 min
Line 3 ยท AquaAarey JVLR โ€“ BKC โ€“ Cuffe Parade5:55 AM10:30 PM from both endsEvery 4 min 25 s
Navi Mumbai Line 1Belapur โ€“ Kharghar โ€“ Pendhar6:00 AMAbout 10:00 PMEvery 10 min (15 off-peak)
MonorailChembur โ€“ Wadala โ€“ Sant Gadge Maharaj Chowkโ€“โ€“Suspended since September 2025

Times are departures from the terminal stations. Trains reach stations along the route a few minutes later, so at a middle station the last train passes after the times shown. Frequencies fall to about 8โ€“10 minutes outside rush hours and on Sundays.

Timings line by line

Line 1 (Blue): Versova โ€“ Andheri โ€“ Ghatkopar

The first trains leave Versova and Ghatkopar at 5:30 AM. The last train leaves Versova at 11:25 PM and Ghatkopar at 11:50 PM, the latest regular departure on any Mumbai metro line. At peak hours trains run about every 3โ€“4 minutes. Line 1 is run by Metro One (MMOPL). Line 1 guide

Line 2A (Yellow): Dahisar (E) โ€“ Andheri (W)

Since April 2026, Line 2A runs as a separate line from Line 7. The first train leaves at 5:50 AM and the last trains leave between about 10:35 and 11:00 PM. Trains run about every 6 minutes at peak and every 8โ€“10 minutes off-peak, with 289 trips on weekdays, 231 on Saturdays and 213 on Sundays. Line 2A guide

Line 7 and Line 9 (Red): Gundavali โ€“ Dahisar (E) โ€“ Kashigaon

Lines 7 and 9 run as one through service from Gundavali in Andheri East to Kashigaon in Mira Road. The first train leaves at 5:50 AM and the last at about 11:00 PM. Trains run about every 6 minutes at peak, with 276 trips on weekdays, 223 on Saturdays and 205 on Sundays. Change at Dahisar (East) for Line 2A. Line 7 guide ยท Line 9 guide

Line 2B (Yellow): Mandale โ€“ Chembur

The first train leaves at 6:00 AM and the last trains leave between about 10:15 and 10:30 PM, roughly every 9โ€“10 minutes. Line 2B guide

Line 3 (Aqua): Aarey JVLR โ€“ Cuffe Parade

The first trains leave Aarey JVLR and Cuffe Parade at 5:55 AM and the last at 10:30 PM. Since 2 November 2026, trains run every 4 minutes 25 seconds at peak, with 337 trips on weekdays. The line also serves both airport terminals. Line 3 guide

Navi Mumbai Metro Line 1: Belapur โ€“ Pendhar

Run by Maha Metro for CIDCO, the line starts at 6:00 AM from Belapur and Pendhar, with the last trains at about 10:00 PM. Trains run every 10 minutes at peak and every 15 minutes off-peak. Navi Mumbai Metro guide

Mumbai Monorail

Monorail services between Chembur, Wadala and Sant Gadge Maharaj Chowk have been suspended since September 2025 for upgrades and safety work, and are not expected to restart before the end of 2026.

Last metro: quick answers

FromLast trainLine
Ghatkopar (towards Versova)11:50 PMLine 1
Versova (towards Ghatkopar)11:25 PMLine 1
Andheri (W) / Dahisar (E)About 10:35 โ€“ 11:00 PMLine 2A
Gundavali / KashigaonAbout 11:00 PMLine 7 + 9
Cuffe Parade / Aarey JVLR10:30 PMLine 3
Mandale / ChemburAbout 10:15 โ€“ 10:30 PMLine 2B
Belapur / PendharAbout 10:00 PMNavi Mumbai Line 1

Festival, holiday and special-day timings

Operators often extend services for big events, so the regular last-train times above can change on these days:

  • Ganeshotsav: in September 2026, Line 3 ran until midnight; Lines 2A, 7, 9 and 2B ran until 12:30 AM; and Line 1โ€™s last train left Ghatkopar at 12:40 AM.
  • New Yearโ€™s Eve: for 2026, Line 3 ran through the night, Line 1โ€™s last train left Ghatkopar at 2:40 AM, and Navi Mumbai Metro ran until 1:30 AM from Belapur.
  • Mumbai Marathon: in January 2026, Line 3 started at 3:30 AM for runners.
  • Maintenance and testing: first trains on Lines 2A, 7 and 9 have sometimes started 30โ€“60 minutes later for testing work on new sections.

Special timings are announced a few days ahead on the operatorsโ€™ apps and social media accounts.

New lines opening soon

  • Line 4 (Gaimukh โ€“ Cadbury Junction, Thane): expected in December 2026.
  • Line 9 Phase 2 (Kashigaon โ€“ Subhash Chandra Bose Stadium, Bhayandar): expected in December 2026.
  • Line 5 (Kapurbawdi โ€“ Dhamankar Naka, Bhiwandi): expected between December 2026 and early 2027.

We will add their timings here as soon as they open.

Mumbai Metro timings: FAQs

What are the Mumbai Metro timings?

Most Mumbai Metro lines run from about 5:30โ€“6:00 AM to about 10:15โ€“11:50 PM. Line 1 runs from 5:30 AM to 11:50 PM (last train from Ghatkopar), Line 3 from 5:55 AM to 10:30 PM, Lines 2A, 7 and 9 from 5:50 AM to about 11:00 PM, and Line 2B from 6:00 AM to about 10:30 PM.

What time is the last metro from Ghatkopar?

The last Line 1 train leaves Ghatkopar for Versova at 11:50 PM.

What time is the first metro in Mumbai?

The earliest regular train is on Line 1, which starts at 5:30 AM from both Versova and Ghatkopar. Lines 2A, 7 and 9 start at 5:50 AM, Line 3 at 5:55 AM and Line 2B at 6:00 AM.

What are the Aqua Line (Line 3) timings?

Line 3 runs from 5:55 AM to 10:30 PM from both Aarey JVLR and Cuffe Parade, with trains every 4 minutes 25 seconds at peak hours.

What are the Metro 2A and Metro 7 timings?

Line 2A (Dahisar East โ€“ Andheri West) runs from 5:50 AM to about 10:35โ€“11:00 PM. Lines 7 and 9 (Gundavali โ€“ Kashigaon) run from 5:50 AM to about 11:00 PM. Both run about every 6 minutes at peak.

Does Mumbai Metro run on Sundays?

Yes. All lines run on Sundays and public holidays, but with fewer trips, so you may wait 8โ€“10 minutes or more.

Is the Mumbai Monorail running?

No. Monorail services have been suspended since September 2025 for upgrades and safety work and are not expected to restart before the end of 2026.

How often do Mumbai Metro trains run?

At peak hours, every 3โ€“4 minutes on Line 1, about 4.5 minutes on Line 3, about 6 minutes on Lines 2A, 7 and 9, and about 9โ€“10 minutes on Line 2B. Off-peak gaps are longer.

Sources: Metro One โ€“ train schedule ยท Lokmat Times โ€“ new MMRDA timetables (Apr 2026) ยท Free Press Journal โ€“ Line 3 adds 46 trips (Nov 2026) ยท Free Press Journal โ€“ Ganeshotsav timings (Sep 2026) ยท Metro Rail News โ€“ Monorail restart delayed (Nov 2026)