Part of our Mumbai Metro guide โ every line, fare, timing and status update in one place.
Mumbai Metro timings at a glance: most lines start between 5:30 and 6:00 AM, and the last trains leave between 10:15 and 11:50 PM. Line 1 (Versova โ Ghatkopar) runs the latest, with its last train from Ghatkopar at 11:50 PM. This page lists the first and last train, peak frequency and operator for every line now running, plus festival and holiday timings.
6 metro lines running in Mumbai ยท Navi Mumbai Line 1
Earliest first train
5:30 AM (Line 1)
Latest last train
11:50 PM (Line 1, Ghatkopar)
Most frequent
Line 1, about every 3โ4 min
Monorail
Suspended
Last checked: November 2026 ยท Timings change for maintenance and festivals โ confirm in the operatorโs app before late-night travel.
Mumbai Metro timings: all lines at a glance
| Line | Route | First train | Last train | Peak frequency |
|---|---|---|---|---|
| Line 1 ยท Blue | Versova โ Andheri โ Ghatkopar | 5:30 AM | 11:25 PM from Versova ยท 11:50 PM from Ghatkopar | About every 3โ4 min |
| Line 2A ยท Yellow | Dahisar (E) โ Andheri (W) | 5:50 AM | About 10:35 โ 11:00 PM | About every 6 min |
| Line 7 + Line 9 ยท Red | Gundavali (Andheri E) โ Dahisar (E) โ Kashigaon | 5:50 AM | About 11:00 PM | About every 6 min |
| Line 2B ยท Yellow | Mandale โ Chembur | 6:00 AM | About 10:15 โ 10:30 PM | About every 9โ10 min |
| Line 3 ยท Aqua | Aarey JVLR โ BKC โ Cuffe Parade | 5:55 AM | 10:30 PM from both ends | Every 4 min 25 s |
| Navi Mumbai Line 1 | Belapur โ Kharghar โ Pendhar | 6:00 AM | About 10:00 PM | Every 10 min (15 off-peak) |
| Monorail | Chembur โ Wadala โ Sant Gadge Maharaj Chowk | โ | โ | Suspended since September 2025 |
Times are departures from the terminal stations. Trains reach stations along the route a few minutes later, so at a middle station the last train passes after the times shown. Frequencies fall to about 8โ10 minutes outside rush hours and on Sundays.
Timings line by line
Line 1 (Blue): Versova โ Andheri โ Ghatkopar
The first trains leave Versova and Ghatkopar at 5:30 AM. The last train leaves Versova at 11:25 PM and Ghatkopar at 11:50 PM, the latest regular departure on any Mumbai metro line. At peak hours trains run about every 3โ4 minutes. Line 1 is run by Metro One (MMOPL). Line 1 guide
Line 2A (Yellow): Dahisar (E) โ Andheri (W)
Since April 2026, Line 2A runs as a separate line from Line 7. The first train leaves at 5:50 AM and the last trains leave between about 10:35 and 11:00 PM. Trains run about every 6 minutes at peak and every 8โ10 minutes off-peak, with 289 trips on weekdays, 231 on Saturdays and 213 on Sundays. Line 2A guide
Line 7 and Line 9 (Red): Gundavali โ Dahisar (E) โ Kashigaon
Lines 7 and 9 run as one through service from Gundavali in Andheri East to Kashigaon in Mira Road. The first train leaves at 5:50 AM and the last at about 11:00 PM. Trains run about every 6 minutes at peak, with 276 trips on weekdays, 223 on Saturdays and 205 on Sundays. Change at Dahisar (East) for Line 2A. Line 7 guide ยท Line 9 guide
Line 2B (Yellow): Mandale โ Chembur
The first train leaves at 6:00 AM and the last trains leave between about 10:15 and 10:30 PM, roughly every 9โ10 minutes. Line 2B guide
Line 3 (Aqua): Aarey JVLR โ Cuffe Parade
The first trains leave Aarey JVLR and Cuffe Parade at 5:55 AM and the last at 10:30 PM. Since 2 November 2026, trains run every 4 minutes 25 seconds at peak, with 337 trips on weekdays. The line also serves both airport terminals. Line 3 guide
Navi Mumbai Metro Line 1: Belapur โ Pendhar
Run by Maha Metro for CIDCO, the line starts at 6:00 AM from Belapur and Pendhar, with the last trains at about 10:00 PM. Trains run every 10 minutes at peak and every 15 minutes off-peak. Navi Mumbai Metro guide
Mumbai Monorail
Monorail services between Chembur, Wadala and Sant Gadge Maharaj Chowk have been suspended since September 2025 for upgrades and safety work, and are not expected to restart before the end of 2026.
Last metro: quick answers
| From | Last train | Line |
|---|---|---|
| Ghatkopar (towards Versova) | 11:50 PM | Line 1 |
| Versova (towards Ghatkopar) | 11:25 PM | Line 1 |
| Andheri (W) / Dahisar (E) | About 10:35 โ 11:00 PM | Line 2A |
| Gundavali / Kashigaon | About 11:00 PM | Line 7 + 9 |
| Cuffe Parade / Aarey JVLR | 10:30 PM | Line 3 |
| Mandale / Chembur | About 10:15 โ 10:30 PM | Line 2B |
| Belapur / Pendhar | About 10:00 PM | Navi Mumbai Line 1 |
Festival, holiday and special-day timings
Operators often extend services for big events, so the regular last-train times above can change on these days:
- Ganeshotsav: in September 2026, Line 3 ran until midnight; Lines 2A, 7, 9 and 2B ran until 12:30 AM; and Line 1โs last train left Ghatkopar at 12:40 AM.
- New Yearโs Eve: for 2026, Line 3 ran through the night, Line 1โs last train left Ghatkopar at 2:40 AM, and Navi Mumbai Metro ran until 1:30 AM from Belapur.
- Mumbai Marathon: in January 2026, Line 3 started at 3:30 AM for runners.
- Maintenance and testing: first trains on Lines 2A, 7 and 9 have sometimes started 30โ60 minutes later for testing work on new sections.
Special timings are announced a few days ahead on the operatorsโ apps and social media accounts.
New lines opening soon
- Line 4 (Gaimukh โ Cadbury Junction, Thane): expected in December 2026.
- Line 9 Phase 2 (Kashigaon โ Subhash Chandra Bose Stadium, Bhayandar): expected in December 2026.
- Line 5 (Kapurbawdi โ Dhamankar Naka, Bhiwandi): expected between December 2026 and early 2027.
We will add their timings here as soon as they open.
Mumbai Metro timings: FAQs
What are the Mumbai Metro timings?
Most Mumbai Metro lines run from about 5:30โ6:00 AM to about 10:15โ11:50 PM. Line 1 runs from 5:30 AM to 11:50 PM (last train from Ghatkopar), Line 3 from 5:55 AM to 10:30 PM, Lines 2A, 7 and 9 from 5:50 AM to about 11:00 PM, and Line 2B from 6:00 AM to about 10:30 PM.
What time is the last metro from Ghatkopar?
The last Line 1 train leaves Ghatkopar for Versova at 11:50 PM.
What time is the first metro in Mumbai?
The earliest regular train is on Line 1, which starts at 5:30 AM from both Versova and Ghatkopar. Lines 2A, 7 and 9 start at 5:50 AM, Line 3 at 5:55 AM and Line 2B at 6:00 AM.
What are the Aqua Line (Line 3) timings?
Line 3 runs from 5:55 AM to 10:30 PM from both Aarey JVLR and Cuffe Parade, with trains every 4 minutes 25 seconds at peak hours.
What are the Metro 2A and Metro 7 timings?
Line 2A (Dahisar East โ Andheri West) runs from 5:50 AM to about 10:35โ11:00 PM. Lines 7 and 9 (Gundavali โ Kashigaon) run from 5:50 AM to about 11:00 PM. Both run about every 6 minutes at peak.
Does Mumbai Metro run on Sundays?
Yes. All lines run on Sundays and public holidays, but with fewer trips, so you may wait 8โ10 minutes or more.
Is the Mumbai Monorail running?
No. Monorail services have been suspended since September 2025 for upgrades and safety work and are not expected to restart before the end of 2026.
How often do Mumbai Metro trains run?
At peak hours, every 3โ4 minutes on Line 1, about 4.5 minutes on Line 3, about 6 minutes on Lines 2A, 7 and 9, and about 9โ10 minutes on Line 2B. Off-peak gaps are longer.
Sources: Metro One โ train schedule ยท Lokmat Times โ new MMRDA timetables (Apr 2026) ยท Free Press Journal โ Line 3 adds 46 trips (Nov 2026) ยท Free Press Journal โ Ganeshotsav timings (Sep 2026) ยท Metro Rail News โ Monorail restart delayed (Nov 2026)
